In August 2019, the Transec unit was in service in the subsidiary company of JSC Kirovsky Zavod. A short time ago, we have received an official letter with a recommendation to use our equipment.

The insulation drying process was performed on the transformer UTMRU 3500/35 in the period of August 21 to 23, 2019. The transformer was running for the entire period of service to provide the power supply to a rolling mill. The efficiency of the Transec unit was confirmed by a humidity monitoring system installed on the transformer and also by the transformer oil testing which has demonstrated a reduction in the oil humidity from 37 to 17 g/T. The dielectric properties of the oil were also improved. With regard to its physical and chemical parameters, it has achieved a full compliance with the requirements of the RD 34.45-51.300-97. The company representatives point out safety and reliability of the unit operation: the insulation drying process was performed continuously and unattended on the running transformer; no oil leakages occurred; the system tightness was confirmed by an absence of actuations of the gas protection. 

The equipment characteristics have achieved the rated values within a short time without a stoppage in production of the plant. M.Y. Geremey, Chief Engineer of Petrostal Metallurgical Plant, recommended using the Transec units at other enterprises of the JSC: "in view of the favorable experience in operation of the Transec unit at Petrostal Metallurgical Plant, I consider it possible to recommend using this equipment for continuous insulation drying of oil-filled filters at other facilities of JSC Kirovsky Zavod". 

  • e7036fdecb3efcd6e31f7703024b86c1.jpg
  • c709c2a85e670fce6f4a2b7bf94510bd (1).jpg
  • c1417c37b781757054f820631bff2908 (1).jpg

22.09.2021

The interim results of the work of the new TRANSEC are ready


The interim results of the work of the new TRANSEC are ready

The equipment at the Pavlovskaya HPP and Zatonskaya Power House of the Bashkir power-producing company was installed in May 2021 and has been actively operating for 3 months

Read more
18.08.2021

Installation of TRANSEC at Shaturskaya CTTPP in Russia


Installation of TRANSEC at Shaturskaya CTTPP in Russia

The power plant was built over a hundred years ago and is one of the oldest in Russia

Read more
07.07.2021

The first of the lightning protection devices, developed to be supplied to SGCC sites, was sent to carry out operational testing in Guangxi province.


The first of the lightning protection devices, developed to be supplied to SGCC sites, was sent to carry out operational testing in Guangxi province.

The lightning protection device has successfully passed certification tests at CEPRI (Wuhan) owned by SGCC. 

During the development, new design and process solutions were found and applied, resulting in improvements of technical characteristics and reducing the cost of a multi-chamber system – the main functional element of a lightning protection device whose design is protected by patents of the Russian Federation and PRC.

Read more
07.07.2021

The TRANSEC power transformer insulation restoration system was installed in Novocherkassk, Russia


The TRANSEC power transformer insulation restoration system was installed in Novocherkassk, Russia

TRANSEC will dry oil and paper insulation on the TCNP 25000/10 transformer

Read more
03.06.2021

On June 2, the Streamer leaders met with the Minister of Economy of Guatemala and the Ambassador of Guatemala to Russia


On June 2, the Streamer leaders met with the Minister of Economy of Guatemala and the Ambassador of Guatemala to Russia
The meeting was held in a warm and friendly atmosphere of a Streamer office. Ivan Zhitenev talked about Streamer innovations and significant installations in Guatemala
Read more
10.05.2021

Ivan Zhitenev took part in the 50th St. Gallen symposium


Ivan Zhitenev took part in the 50th St. Gallen symposium

The St. Gallen Symposium is a student initiative aimed at fostering an intergenerational dialogue and bringing world leaders and experts together.

Read more
29.04.2021

Installation of a new TRANSEC at the Elizavetinskaya compressor station of Gazprom in Russia


Installation of a new TRANSEC at the Elizavetinskaya compressor station of Gazprom in Russia

The compressor station pumps Russian gas to Europe via the Nord Stream gas pipeline.

Read more
25.02.2021

Line Lightning Protection with LLPDd69z for NGCP in Pampanga, Philippines.


Line Lightning Protection with LLPDd69z for NGCP in Pampanga, Philippines.
The adventure has started with training the linemen who will be later mounting the LLPDs on the power line. In total, it was five teams with eight workers in each. We held a practical workshop at Pampanga Substation's warehouse. During the training, we presented the principle of LLPD – the EasyQuench system and focused on the features essential for the installation and maintenance crew.
Read more
22.02.2021

First TRANSEC installation Nicaragua


First TRANSEC installation Nicaragua
Streamer installed TRANSEC for Wind Power a company who specialize in software development and wind power plant maintenance. TRANSEC was introduced for drying transformers 230 kV, 60 MVA.
Read more
18.02.2021

Frequently Asked Questions on Line Lightning Protection Devices (LLPD) are now aired on the Streamer webpage.


Frequently Asked Questions on Line Lightning Protection Devices (LLPD) are now aired on the Streamer webpage.
In this chapter, you can find the Frequently Asked Questions on LLPD, inspired by our customers. We hope that the comprehensive answers will be useful for anyone interested in the lightning protection of overhead lines.
Read more
04.02.2021

Malaysia On-Site Training for LLPD dM35z


Malaysia On-Site Training for LLPD dM35z
Prior to the large tender awarded by TNB to Streamer Electric AG, we conducted on-site trainings for the LLPD dM35z installation. The purpose of this activity was to educate the end-user personal for proper installation of LLPDs and selecting the most suitable accessories for each tower. The onsite training was conducted in four different cities: Selangor, Johor, Perak, and Kedah.
Read more
01.02.2021

LLPD project in Inner Mongolia, China


LLPD project in Inner Mongolia, China
And here one more successful LLPD-project from China where Streamer has equipped 2 power lines with 150 pieces of Line Lightning Protection Devices 11kV for direct lightning protection, SAd10z and 100pcs for indirect lightning protection SAi10z inHuabei Oilfield Erlenhot Branch (Erenhot, Inner Mongolia).
Read more
14.01.2021

The TRANSEC pilot module was installed for the Petrostal Metallurgical Plant in Russia


The TRANSEC pilot module was installed for the Petrostal Metallurgical Plant in Russia

The equipment is being tested on the TDR 12500/10 transformer.

Read more
11.11.2020

First installation of TRANSEC units in Ecuador


First installation of TRANSEC units in Ecuador
Four TRANSEC units were installed on 19th-23rd October in Ecuador for the local energy companies
Read more
13.10.2020

Vietnam Ha Giang Power Company will test Streamer innovative devices of lightning protection.


Vietnam Ha Giang Power Company will test Streamer innovative devices of lightning protection.

Ha Giang is a mountainous province with a complex topography and experiences extremely high lightning density during the thunderstorm season. 110 kV lines in the province mostly pass through mountainous terrain, many rivers, and streams, so breaks of the line wires due to lightning, are not uncommon. Most of the problem areas are concentrated in areas such as the Nam Ngan hydroelectric power plant and the city of Viet Kuang. Installation of innovative lightning protection devices to provide the region with uninterrupted power supply was necessary. 

Read more
08.10.2020

Streamer in Summer Biathlon Championship in Sosnoviy Bor, Russia


Streamer in Summer Biathlon Championship in Sosnoviy Bor, Russia

The Summer Open Biathlon Championship (formerly the Tournament for the Prizes of Dmitriy Malyshko) took place on September 26-27, 2020 in Sosnoviy Bor, Leningrad region, Russia. 

Read more
01.07.2020

Supply of the dM35z LLPDs to Malaysia


Supply of the dM35z LLPDs to Malaysia
Streamer won a tender for a supply of the LLPD dM35z to Malaysia in 2019.
Read more
06.04.2020

A simple solution for the prevention of COVID-19


A simple solution for the prevention of COVID-19
The key measures to prevent coronavirus are to avoid crowds, do not touch your face, and one of the most important is to minimize the interaction with surfaces of “popular objects” that are encountered by everyone.
Read more
30.03.2020

The first Transec unit has been installed in Kazakhstan and Central Asia by Streamer


The first Transec unit has been installed in Kazakhstan and Central Asia by Streamer

In mid-March 2020, the first installation of the Transec unit has been completed in Kazakhstan.

Read more
11.03.2020

New LLPDs d69z have been installed in Indonesia.


New LLPDs d69z have been installed in Indonesia.

Installation of a new type of LLPDs on the line in Indonesia has been completed in February 2020. Streamer and representatives of the Indonesian PLN power system will be testing the equipment for two years with the assistance of the friendly Bandung Institute in the name of professor Reynaldo Zoro and his team. This will result in open reports and presentations with the recommendations for use.